Performance of Technical Customer's functions

CEMCP
ROSATOM

CEMCP carries out the entire list of Technical Customer's functions, including the following:

  • Front-end construction design
  • Conclusion of contracts on behalf of the Developer
  • Organization and control of design works
  • Organization of the construction process
  • Organization of construction control

Front-end construction design

  • organization and implementation of input data collection for execution of design works
  • organization and control of engineering surveys

Conclusion of the following contracts on behalf of the Developer

  • for hook-up to utility systems of utility providers
  • for engineering surveys
  • for design works
  • for expert examinations and approvals (including expert examination of engineering survey results and project documentation, as well as assessment of the estimated cost reliability)
  • for construction, installation, and commissioning works (Prime Contracts)

Organization and control of design works

  • preparation and control of execution of the project work schedule
  • acceptance control of project documentation (Project and Detailed Design Documentation phases)
  • acceptance control of estimate documentation (Project and Detailed Design Documentation phases)
  • organization of expert examination of engineering survey results and project documentation, as well as assessment of the estimated cost reliability
  • Approval (on behalf of the Developer) of project documentation

Organization of the construction process

  • issuance of project documentation and estimates for further performance of works
  • development and updated of the schedule of works production, including the use of specialized software systems (Spider Project, Oracle Primavera, etc.) in accordance with the approved project documentation
  • monitoring of compliance with the planned deadlines by construction and installation works
  • monitoring of contractors' compliance with contractual obligations on the basis of data on acceptance of completed works
  • maintenance of operational records of construction in progress: growing scopes and costs of accepted and paid construction and installation works
  • verification of procurement documents (lists, prices, volumes) of construction and assembly organizations and suppliers
  • control of unreasonable increase of rates, volumes, as well as identification and rejection of unreasonable costs
  • organizing and conducting of control and expert procedures

Organization of construction control

According to Item 53 of the Town Planning Code of the Russian Federation No 190 as of 29th of December, 2004, and the Regulations on construction control during construction, reconstruction, and overhaul of capital construction projects (approved by Decree No 468 of the Government of the Russian Federation as of 21st of June, 2010):

  • quality control of works performed by the General Contractor within the object in the scope defined by the Customer's technical assignment, including control of conformity of construction materials, items and finished structures used in accordance with the approved detailed design documentation
  • acceptance control of works performed within the object, inspection of concealed works, participation in intermediate acceptance of critical structures
  • participation in inspection and acceptance of utility systems
  • tracking of detailed design documentation progress
  • control of timely identification by the General Contractor of comments to the detailed design documentation to be presented in writing
  • control of elimination of defects in the detailed design documentation identified in the course of re-equipment, documented return of defective documentation to the designer, control and documented acceptance of corrected documentation
  • preliminary acceptance and confirmation of scopes of completed types (phases) of works
  • confirmation of currently completed scope of works, quality, elimination of defects and identified discrepancies
  • signing (authorization) of reports on completion under the КС-2 form based on the КС-6a certificates
  • control of completeness and correctness of execution of as-built production and technical documentation provided by the General Contractor
  • suspension (if necessary) of site works, in case of detection of circumstances that may badly impact the quality of works performed therein or the impossibility of their completion and notification of the customer, including ones in case of detection of the following:
    • non-compliance of the content of site works performed to the current norms and technical conditions
    • non-compliance of site works performed by the General Contractor to the approved project and detailed design documentation
    • unsuitability or poor quality of materials, equipment, technical documentation used to perform site works
    • violation of operation technology by the General Contractor
    • risks of adverse consequences for the Customer of the General Contractor's performance of site works
    • other circumstances that may badly affect the quality of site works
  • control of elimination of defects revealed during the acceptance of services rendered
  • control of maintenance of operational logs and supervision with timely elimination of remarks noted therein
  • ensuring of receipt of as-built documentation from the General Contractor for its transfer to the customer
  • control of compliance with the operational schedule